ADU Permitting Process in Goleta
Navigate the permit process smoothly with our expert guidance and support.
The permitting process can be one of the most challenging aspects of building an ADU in Goleta. Our team specializes in navigating this process efficiently, helping you avoid costly delays and ensuring your project meets all local requirements. Here's what you need to know about the permit process:
The Complete Permitting Process
Pre-Application
- Schedule a pre-application meeting with the City of Goleta Planning Department
- Discuss zoning restrictions and requirements specific to your property
- Identify potential challenges and compliance issues early
- Estimate timeline and fee schedule for approval process
Average timeframe: 1-2 weeks
Plan Preparation
- Prepare detailed site plan showing property boundaries and ADU location
- Develop architectural plans including floor plans, elevations, and sections
- Prepare structural plans and calculations for building department review
- Include mechanical, electrical, and plumbing plans that meet current codes
Average timeframe: 4-8 weeks
Permit Review
- Submit completed plans and application to the Goleta Planning Department
- Pay application and plan check fees (typically $8,000-$15,000 for ADUs)
- Respond to plan check comments and make necessary revisions
- Obtain approvals from all required departments (building, planning, fire, public works)
Average timeframe: 6-12 weeks
Construction Phase
- Pay permit fees and pick up approved building permits
- Schedule required inspections at key construction milestones
- Address any correction notices from building inspectors
- Obtain final inspection approval and certificate of occupancy
Average timeframe: 3-6 months depending on project complexity
Required Documents for Permitting
To ensure a smooth permitting process, you'll need to prepare and submit the following documents:
Site Plan
- Property boundaries and dimensions
- Location of existing structures and proposed ADU
- Setback dimensions from property lines
- Parking spaces and driveway access
- Utility connections and easements
- Trees and landscaping features
Architectural Plans
- Floor plans with room dimensions and uses
- Exterior elevations showing all sides of the ADU
- Building sections showing construction details
- Roof plan and drainage details
- Window and door schedules
- Accessibility compliance features (if applicable)
Structural Plans
- Foundation plan and details
- Framing plans for floors, walls, and roof
- Structural calculations signed by an engineer
- Shear wall and lateral bracing details
- Connection details for structural elements
- Earthquake and wind load compliance
MEP Plans
- Electrical plan showing outlets, fixtures, and panel
- Plumbing plan showing fixtures and connections
- Mechanical plan showing HVAC equipment and ducts
- Energy calculations and Title 24 compliance
- Fire sprinkler plans (if required)
- Smoke and carbon monoxide detector locations
Permit Fees in Goleta
Understanding the permit fee structure will help you budget appropriately for your ADU project:
Fee Type | Typical Cost Range | Notes |
---|---|---|
Plan Check Fee | $3,000 - $6,000 | Based on project valuation |
Building Permit Fee | $2,000 - $5,000 | Based on square footage and valuation |
Impact Fees | $5,000 - $10,000 | May be reduced for ADUs under 750 sq ft |
School Fees | $3.48 per sq ft | Collected for residential construction |
Utility Connection Fees | $3,000 - $8,000 | May be waived for ADUs connected to main house |
Fire Review Fee | $500 - $1,500 | Required for all new construction |
Note: Fee amounts are approximate and subject to change. Contact the City of Goleta for the most current fee schedule.
Permitting Resources
Goleta ADU Permitting Checklist
Comprehensive list of required documents and steps for obtaining ADU permits in Goleta.
Download ChecklistGoleta ADU Fact Sheet
Detailed guide with essential information about ADU regulations and requirements in the City of Goleta.