The permitting process can be one of the most challenging aspects of building an ADU in Goleta. Our team specializes in navigating this process efficiently, helping you avoid costly delays and ensuring your project meets all local requirements. Here's what you need to know about the permit process:

The Complete Permitting Process

1

Pre-Application

  • Schedule a pre-application meeting with the City of Goleta Planning Department
  • Discuss zoning restrictions and requirements specific to your property
  • Identify potential challenges and compliance issues early
  • Estimate timeline and fee schedule for approval process

Average timeframe: 1-2 weeks

2

Plan Preparation

  • Prepare detailed site plan showing property boundaries and ADU location
  • Develop architectural plans including floor plans, elevations, and sections
  • Prepare structural plans and calculations for building department review
  • Include mechanical, electrical, and plumbing plans that meet current codes

Average timeframe: 4-8 weeks

3

Permit Review

  • Submit completed plans and application to the Goleta Planning Department
  • Pay application and plan check fees (typically $8,000-$15,000 for ADUs)
  • Respond to plan check comments and make necessary revisions
  • Obtain approvals from all required departments (building, planning, fire, public works)

Average timeframe: 6-12 weeks

4

Construction Phase

  • Pay permit fees and pick up approved building permits
  • Schedule required inspections at key construction milestones
  • Address any correction notices from building inspectors
  • Obtain final inspection approval and certificate of occupancy

Average timeframe: 3-6 months depending on project complexity

Required Documents for Permitting

To ensure a smooth permitting process, you'll need to prepare and submit the following documents:

Site Plan

  • Property boundaries and dimensions
  • Location of existing structures and proposed ADU
  • Setback dimensions from property lines
  • Parking spaces and driveway access
  • Utility connections and easements
  • Trees and landscaping features

Architectural Plans

  • Floor plans with room dimensions and uses
  • Exterior elevations showing all sides of the ADU
  • Building sections showing construction details
  • Roof plan and drainage details
  • Window and door schedules
  • Accessibility compliance features (if applicable)

Structural Plans

  • Foundation plan and details
  • Framing plans for floors, walls, and roof
  • Structural calculations signed by an engineer
  • Shear wall and lateral bracing details
  • Connection details for structural elements
  • Earthquake and wind load compliance

MEP Plans

  • Electrical plan showing outlets, fixtures, and panel
  • Plumbing plan showing fixtures and connections
  • Mechanical plan showing HVAC equipment and ducts
  • Energy calculations and Title 24 compliance
  • Fire sprinkler plans (if required)
  • Smoke and carbon monoxide detector locations

Permit Fees in Goleta

Understanding the permit fee structure will help you budget appropriately for your ADU project:

Fee Type Typical Cost Range Notes
Plan Check Fee $3,000 - $6,000 Based on project valuation
Building Permit Fee $2,000 - $5,000 Based on square footage and valuation
Impact Fees $5,000 - $10,000 May be reduced for ADUs under 750 sq ft
School Fees $3.48 per sq ft Collected for residential construction
Utility Connection Fees $3,000 - $8,000 May be waived for ADUs connected to main house
Fire Review Fee $500 - $1,500 Required for all new construction

Note: Fee amounts are approximate and subject to change. Contact the City of Goleta for the most current fee schedule.

Permitting Resources

Goleta ADU Permitting Checklist

Comprehensive list of required documents and steps for obtaining ADU permits in Goleta.

Download Checklist

Goleta ADU Fact Sheet

Detailed guide with essential information about ADU regulations and requirements in the City of Goleta.

View Guide